Short Lead Time for Non Alloy Steel Pipe - Boiler Pipe/Tube – Top

Short Description:

Spec Grades ASTM A53 A53A、A 53B ASTM A106 A106B、A106C ASTM A179 A179 ASTM A192 A192 ASTM A210 A210A1、A210C ASTM A333 Grade 1、Grade 6 ASTM A213 T11、T12、T22、T5、T9、T91、T92 ASTM A335 P5、P9、P11、P12、P22、P23、P36、P91、P92 ASME SA53 SA53A、SA 53B ASME SA106 SA106B、SA106C ASME SA179 SA179 ASME SA192 SA192 ASME SA210 SA210A1、SA210C ASME SA333 Grade 1、Grade 6 ASME SA213 T11、T12、T22、T5、...


Product Detail

Product Tags

Related Video

Feedback (2)

The corporation upholds the philosophy of "Be No.1 in high quality, be rooted on credit rating and trustworthiness for growth", will continue to serve outdated and new consumers from home and overseas whole-heatedly for 500x500 Square Steel Tube , Hollow Steel Tube , Mechanical Steel Pipe Low Price , Our company insists on innovation to promote the sustainable development of enterprise, and make us become the domestic high-quality suppliers.
Short Lead Time for Non Alloy Steel Pipe - Boiler Pipe/Tube – Top Detail:

Boiler Pipe

Spec

Grades

ASTM A53

A53A、A 53B

ASTM A106

A106B、A106C

ASTM A179

A179

ASTM A192

A192

ASTM A210

A210A1、A210C

ASTM A333

Grade 1、Grade 6

ASTM A213

T11、T12、T22、T5、T9、T91、T92

ASTM A335

P5、P9、P11、P12、P22、P23、P36、P91、P92

ASME SA53

SA53A、SA 53B

ASME SA106

SA106B、SA106C

ASME SA179

SA179

ASME SA192

SA192

ASME SA210

SA210A1、SA210C

ASME SA333

Grade 1、Grade 6

ASME SA213

T11、T12、T22、T5、T9、T91、T92

ASME SA335

P5、P9、P11、P12、P22、P23、P36、P91、P92

DIN17175

ST35.8、ST45.8、15Mo3、13CrMo44、10CrMo910

EN10216-1

P195TR1、P195TR2、P235TR1、P235TR2、P265TR1、P265TR2

EN10216-2

P195GH、P235GH、P265GH、16Mo3、13CrMo4-5、10CrMo9-10、X10CrMoVNb9-1、X10CrWMoVNb9-2

EN10216-3

P355NH、P460NH、P620QH、P690QH


Product detail pictures:

Short Lead Time for Non Alloy Steel Pipe - Boiler Pipe/Tube – Top detail pictures


Related Product Guide:
Cooperation

"Control the quality by the details, show the strength by quality". Our company has strived to establish a highly efficient and stable staff team and explored an effective quality control process for Short Lead Time for Non Alloy Steel Pipe - Boiler Pipe/Tube – Top, The product will supply to all over the world, such as: South Africa, Ghana, Southampton, We will not only continuously introduce technical guidance of experts from both home and abroad, but also develop the new and advanced products constantly to satisfactorily meet the needs of our clients all over the world.
  • This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
    5 Stars By Danny from Georgia - 2018.10.31 10:02
    As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Candy from Johannesburg - 2018.10.01 14:14

    Related Products